OPEN
Already registered? Download PDF LOGIN or SIGN UP
Editor in chief: Angelo Scorza
Print
03/02/20 10:29

PSA Genova Pra’ launched a second rail track aiming at doubling the number of trains

By 2023 the largest container terminal in Genoa will achieve a 7 lines siding to operate 750 meters long trains. The ro-ro pier will be demolished and the platform will have 400 additional meters on the east without interfering with the airport conical surface

Content reserved for registered users

To read this article you must be registered.
If you are already registered, please login.
If you are not registered please register.